Enable Automatic Synchronization of Product Updates from Material Masterdata
planned
V
Vanessa Rosário
Currently, any changes made to product information in Material Masterdata (such as status updates or flags) are not automatically reflected on MARLÖ. This requires opening a ticket for every update, which creates unnecessary duplication of work and delays.
Specifically, when a product status changes to indicate unavailability, it should be automatically removed from the web. Similarly, if the “Web Ordering Allowed” flag is removed, the product should no longer be available online. Any other changes in Material Masterdata should also sync automatically.
In the previous ordering platform, EasyOnline, this synchronization was fully automated and worked seamlessly. We need the same functionality in MARLÖ to ensure data consistency and operational efficiency.
N
Niloofar Farmand
marked this post as
planned
Hi Vanessa, work is already done but we will enable this in the new year to avoid any production issues in December
M
Małgorzata Gnap
Hi! In Poland we have this same problem with the missing automatic connection between SAP-MArlo. Every change (e.g. listing, exclusion, limited availability) requires creating tickets.